Impressive Concrete Coatings

Impressive Concrete Coatings Installation Process

Expert Application



     Expert Preparation & Application

 

Application Step One

STEP 1

THE PREPARATION

With a 30” Planetary propane grinder we utilize diamond tip grinding pads to profile the concrete to open up the pores of the concrete. This will allow the basecoat to better adhere to the clean surface.

All of our equipment is attached to HEPA vacuums to keep the dust to a minimum.

.

 
Application Step Two

STEP 2

CONCRETE REPAIRS 

During this step we will repair any hairline cracks or pitting with a fast setting, low viscosity modified polyurea repair material.

We will grind these areas again, and then vacuum the entire area to eliminate any dust from the floors.

 
 
Application Step Three

STEP 3

BASECOAT AND BROADCASTING CHIPS

The 2-part polyuria basecoat is applied by rolling it out onto the concrete surface, while the basecoat is wet; the colored flakes are broadcast into the basecoat.

 
Application Step Four

STEP 4

SCRAPING THE CHIPS

Once the basecoat is cured (1 to 1-1/2 hours) the floor gets scraped and vacuumed to remove any loose or vertical standing flakes

 
Application Step Five

STEP 5

SCRAPING THE CHIP

Once the basecoat is fully cured the floor is scraped and vacuumed to remove any loose or vertical standing flakes.

 
Application Step Six

STEP 6

TOPCOAT

The final step is to roll out the UV stable 2-part polyaspartic topcoat

 


Impressive concrete coatings from VRS Media Group on Vimeo.